Proven experience in delivering high profile contracts

Refurbishments of offices require a careful approach to ensure a continuous working environment is maintained throughout the contract period. Complete Interior Solutions Ltd has the planning and scheduling skills and experience to ensure that your workplace is uninterrupted and provides unbroken service to your clients.


From bespoke reception and meeting room concepts to complete environment restructuring, we work with you to create a workplace which matches your expectations.

Eurofins UK Case Study

Eurofins are a Leading International Group of Testing Laboratories.


Our Brief

Ongoing maintenance and laboratory refurbishment works. At present Complete Interior Solutions are responsible for the maintenance and refurbishment works for Eurofins UK & Ireland. Locations consisting of Wolverhampton i54, Acton West London, Middlesborough, Derby, Brighton, Otterbourne and Belfast.


Solution
  • Full project management
  • Health and safety administration
  • Ground works
  • Building works
  • Plumbing and gas installation , including the use of Vulcathene
  • Heating , ventilation and air conditioning
  • Electrics and data
  • Supply & installation of specialist laboratory work surfaces & base units
  • Flooring
  • Partitions and ceilings
  • Bespoke joinery
  • Internal and external signage
  • Decoration

Royal Quay Case Study

Commercial building at Royal Quay , Coppermill Lock area of Harefield.


Our Brief

To refurbish two large office areas on this 3.5 acre site, comprising 30.000sqft of existing commercial floorspace in the attractive Royal Quay, Coppermill Lock area of Harefield.


Solution
  • Full project management
  • Health and safety administration
  • Strip-out
  • Plumbing and gas installation
  • Electrics, data and fire alarm
  • Bespoke joinery
  • Partitions and ceilings
  • Flooring
  • Decoration
  • Tiling

Middleton Place Case Study


Our Brief

To transform an existing four storey office block into a high specification, three bedroom, two bathroom domestic residence, in this highly sought after and exclusive part of London’s vibrant west end. This property is only a stone's throw away from the world famous Regent Street.


Solution
  • Full project management and C.D.M coordination
  • Building control applications and approvals
  • Health and safety administration
  • Structural steels and building work including needle shoring
  • Plumbing and gas installation
  • Electrics , data and fire alarm
  • Bespoke joinery
  • Partitions and ceilings
  • Flooring
  • Plastering
  • Decoration
  • Tiling

Godolphin Road Case Study


Our Brief

A total new build property in this desirable area of Chiswick , West London. C.I.S Ltd were instructed as principal contractors to this project as this was a private development for one of our London based clients.


Solution
  • Full project management and C.D.M coordination
  • Building control applications and approvals
  • Health and safety administration
  • Foundations , ground work and drainage
  • Main incoming services – electricity, water and gas
  • Brick work
  • Pitched and flat roofing
  • Full insulation
  • Plumbing and gas installation
  • Electrics , data and fire alarm
  • Partitions and ceilings
  • Bespoke joinery
  • Flooring
  • Plastering
  • Decoration
  • Tiling

Warwick Street Offices Case Study


Our Brief

To fully refurbish an existing 3rd floor office space in this sought after area of the capital only two minutes walk from Regent Street and Piccadilly Circus.


Timescale: 3 weeks


Solution
  • Electrics and data
  • Air conditioning
  • Plumbing
  • Decoration
  • Soild partitions and ceiling
  • New full height glazed partitions and doors from the Vitrage system
  • Flooring
  • Joinery
  • Building regulations
  • Health and safety

Eurofins Hull Case Study


Our Brief

Continuing our working relationship with Eurofins UK we were appointed as principle contractors to oversee the complete refurbishment of an existing stand alone industrial unit in Hull. The project involved turning the unit into a state of the art testing laboratory in keeping with their super laboratory at the i54 site in Wolverhampton.


Timescale: 6 weeks


Solution
  • Fire rated partitions and ceilings
  • Demountable glazed partitions
  • Electrics and data
  • Plumbing including Vulcathene pipework
  • Air conditioning and ventilation
  • Joinery
  • Aluminium windows
  • Steel security shutters
  • Specialist Trespa laboratory work surfaces and framework
  • Vinyl flooring
  • Plastering
  • Decoration
  • External safety compounds
  • External fire escape ramps and handrails
  • Full health and safety and construction phase plan
  • Building regulations, control and planning