We undertake a wide range of domestic projects

Complete Interior Solutions Ltd undertakes a wide range of domestic/residential work including refurbishments, renovations, restorations, conversions, extensions and alterations to buildings of all ages and sizes.


As well as working on modern building projects we also undertake work on old buildings and ensure everything we do matches the original style exactly.

Eyton House Case Study


Our Brief

To Fully transform an existing 4 bed residential property to include adding a full extension to the rear and balcony overlooking the paddocks, also a showroom style triple garage.


Solution
  • Full project management
  • Health and safety
  • Building control
  • Steel erection and brickwork
  • Full pitched roof to the garage
  • External plumbing and drainage
  • Block paving and ground works
  • External K Render
  • Aluminium bifold doors
  • Upvc windows and doors
  • Full internal refurbishment
  • Electrics
  • Plumbing
  • Underfloor heating
  • Partitions and ceilings
  • Plastering
  • Joinery
  • Floor coverings
  • Decoration

Middleton Place Case Study


Our Brief

To transform an existing four storey office block into a high specification, three bedroom, two bathroom domestic residence, in this highly sought after and exclusive part of London’s vibrant west end. This property is only a stone's throw away from the world famous Regent Street.


Solution
  • Full project management and C.D.M coordination
  • Building control applications and approvals
  • Health and safety administration
  • Structural steels and building work including needle shoring
  • Plumbing and gas installation
  • Electrics , data and fire alarm
  • Bespoke joinery
  • Partitions and ceilings
  • Flooring
  • Plastering
  • Decoration
  • Tiling

Cotswold Lodge Case Study


Our Brief

This project presented a number of challenges due to the locality and position of the property but on completion was an exceptional transformation in very desirable area to live.


Solution
  • Full project management
  • Health and safety
  • Steel works to form portal frame
  • External met deck balcony and steel supports
  • External K render
  • Roof tiling
  • Aluminium windows and bifold doors
  • Ground works and drainage
  • Plumbing
  • Electrics
  • Partitions
  • Insulation
  • Plastering

Godolphin Road Case Study


Our Brief

A total new build property in this desirable area of Chiswick , West London. C.I.S Ltd were instructed as principal contractors to this project as this was a private development for one of our London based clients.


Solution
  • Full project management and C.D.M coordination
  • Building control applications and approvals
  • Health and safety administration
  • Foundations , ground work and drainage
  • Main incoming services – electricity, water and gas
  • Brick work
  • Pitched and flat roofing
  • Full insulation
  • Plumbing and gas installation
  • Electrics , data and fire alarm
  • Partitions and ceilings
  • Bespoke joinery
  • Flooring
  • Plastering
  • Decoration
  • Tiling

Private Residence Case Study

Private domestic client based in Staffordshire.


Our Brief

To completely refurbish an existing double garage into a two storey residence. This project included development of downstairs kitchen and living accommodation and upstairs double bedroom and bathroom.


Timescale: 8 Weeks


Solution
  • Full project management and C.D.M coordination
  • Building control applications and approvals
  • Computer aided design (CAD)
  • Strip out
  • Plumbing and gas installation
  • Electrics
  • Insulation
  • Flooring
  • Walls and ceilings
  • UPVC doors and windows
  • Fitted kitchen and bathrooms
  • Staircase design and installation
  • Decoration

Private Residence Case Study

Private domestic client based in St Albans.


Our Brief

To refurbish existing and kitchen and utility area, creating additional space and an open plan environment.


Timescale: 3 Weeks


Solution
  • Full project management and C.D.M coordination
  • Building control applications and approvals
  • Demolition
  • Plumbing
  • Electrics
  • Flooring and tiling
  • Walls and ceilings
  • Joinery
  • Decoration

New Cavendish Street Case Study


Our Brief

To fully refurbish a 4th floor three bedroom flat in the heart of Fitzrovia in the West End of London only a short walk from the BBC studios and Regent's Park.


Timescale: 10 Weeks


Solution
  • Complete strip out
  • Overhaul of existing sash windows
  • Secondary glazing
  • CFull decoration and wallpaper
  • New lighting and electrics
  • Plumbing to bathroom suites and kitchen
  • New bespoke kitchen
  • Corian work surfaces
  • Karndean flooring throughout
  • Joinery
  • Health and safety
  • Complete strip out